Project Overview Chapter 1
I. Overview township macro background and project planning
1. Location
Township officials spent Guangrao County in the north, away from the county town 15.5 kilometers, north CHEN Guan township, south of stone villages, towns, villages and small stone east ZHUANG Zhen, and the west side for the Boxing County neighbors. Geographical location in east longitude 118 ° 20 ˊ 21 "to 118 ° 30 ˊ 48" E, 37 ° 7 ˊ 53 "to 37 ° 15 ˊ 42" between, and throughout the village area of 117.3 square kilometers, presiding over 39 administrative villages 37,500 population.
总平面图
2. History and culture
Township officials spent a long history. According to research in prehistoric far in the late Neolithic (about 5,000 years ago), there are human beings living in, and multiply. Warring States齐桓公to set up Parkinson independent Taiwan,齐景公and Yan Zi in the less-traveled places have this. Western Han period, the government spent Rural Old City (a city that for the Ancient Music) sites in this north-20, a flower official township, after Hou Han Emperor Wu元狩first year (BC 122) closure for Zihe川靖王之子Liu Guangrao Hou.
A long history and splendid civilization, and to the side of land left many monuments. Warring States Parkinson independent Taiwan initially high 3 height, radius of 10 acres (now 40 acres), the stage殿宇spectacular, pine green, is文人墨客mecca. 2600 years, Parkinson independent Taiwan invaded through wind erosion rain, the flames狼烟, Ran relics still remain. Now the Taiwan high of about six meters, something long 160 meters north and south width 120 meters with a total area of 19,200 square meters, in 1985 announced municipal key units to be protected. Le site of the Old City things long 400 meters north and south width 380 meters. In 2500, China's great strategist, "The Art of War" on the birth of the author of Sun Wu here. These sites to study ancient cultures spent Officer provided in-kind basis, but also in Cuba寻幽the resort.
3. Natural resources
Planting garlic has a long history and has been called the "Home of garlic," said. Underground oil and gas resources and is the Le'an oil-producing areas.
4. Climatic conditions
The Registry is located in warm temperate flowers Township, a monsoon climate, there was no significant difference in climate. Climate is characterized by rain, heat the same quarter last year, the mainland strong (mainland degrees 66.4), alternating cold and heat, Four Seasons clear. Spring 3 ~ May, the temperature warmed up faster, less precipitation, wind speed, the climate is arid. Summer is 6 ~ August, the temperature, humidity, precipitation concentrated, hot and humid climate. Autumn was 9 ~ November, the temperature depressed rainfall drop, the days of high气爽. Winter is 12 ~ February, scarce rain and snow, the cold dry.
5. Socio-economic and infrastructure
In recent years, the official village party committee spent, the government vigorously implement the industrialization of agriculture, rural industrialization and rural urbanization strategy, economic and social comprehensive progress in various undertakings. Have been provincial, city awarded "Star township", "advanced the industrialization of agriculture township." 2003 GDP amounted to 282 million yuan, disposable financial 10.32 million yuan, the per capita net income of farmers reached 3,512 yuan. Throughout the village formed a garlic, Rusiji, cotton three major industrial chain, planting garlic 6 million mu Roushiji the processing capacity of 35 million, the processing of cotton 5 million piculs above棉类enterprises more than 20. The rapid development of enterprise planning and construction of four industrial projects, throughout the village formed a Dongying City, Fitch Industrial Group Limited, Dongying City Spring Bud textile limited liability company, Dongying City Hua Dyeing Ltd., Dongying Flower construction of a limited liability company official of a leading enterprise such as the Rusiji processing, feeding raw material processing, vegetable processing, cotton processing textile, construction and building materials industry development system. Water, electricity and roads, and other infrastructure - complete set of built 35 KV power supply lines; Rural roads accessible covered by roads, Qualcomm bus; The percentage of program - controlled telephone achieve more than 90%; After more than 10 consecutive years of comprehensive agricultural development, agricultural production conditions greatly improved. Small towns function is improving daily, initially forming a collection administration, culture, education, health, finance, commerce, catering, service, which integrates urban center for economic development and social progress in creating a good environment.
Second, project planning micro-background
1. Block status and functions: the status of southern, central Township is the official flower fishery production, there are some fish ponds and shrimp ponds; Jujube East Forest 50 acres industries; West is the status quo farmland, and the terrain flat.
2. Status problems:
A. Status scattered chaos, water and land Without a good organizational relationships
B. no landscape View lines, a lack of application on the landscape elements
C. lack of essential humane modification, the entire site appears pale disorder
3. Project planning need
According to official flower Rural 2010 Vision master plan, a wetland ecological park officials spent the overall planning of the township industrial, commercial and residential north side, belongs to the public green area. Officials in the township government spent resident and planning to spend the village center officials Village, Nishimura and the trail between Xin Road. Township resident will be built on the improvement of living standards of residents has played a significant role in boosting. At the same time several centers located in the village of Junction, on the official township spent building a major role in promoting. At the same time as the local tourism economic development opportunities.

Vantage map
Chapter II design basis, design principles, design concepts
First, the design basis
1, "People's Republic of China Law on Urban Planning"
2, "the method of drawing up urban planning" and implementation details
3, "city planning by category and construction standards"
4, "vertical city planning norms" (CJJ 83-99)
5, "City Traffic Planning and Design norms" (GB 50220-95)
6, "Green urban road planning and design specifications" (CJJ 75-97)
7, "park design specifications" (CJJ48-92)
8, "City project pipeline integrated planning norms" (GB 50289-98)
9, "urban green space classification criteria" (CJJ / T 85-2002)
10, "Township officials spent overall plan (1994 - 2020)"
11, spent Officer villages, "10th Five-Year" Plan and 2010 Long-Term Goals for
12, township government officials spent on ecological wetland park landscape planning adjusted views
Second, the design principles
(1) the principle of ecological priority
(2) the principle of systemic and regional
(3) visual aesthetic principles
(4) environmental protection, ecology, the principle of combining energy conservation;
(5) operable principles
Third, the design concepts: ecological,野趣, geographical, cultural
(1)师法natural harmony with nature. Also naturally on the Town, and create a pleasant environment
(2) Based on the urban context, mining officials spent Rural historical and cultural characteristics, given the rich cultural connotation Park;
(3) a people-centered approach, embodied Park humanized design;

The main effect of the import plans
Chapter III of Landscape Planning
1. Park Location
Ecological urban wetland landscape characteristics - Water officials spent wetland park
2. Design goals
Through the details, shape, color, space intentions and the integration of landscape themes to create a transformation of local characteristics, personality distinct wetland ecological park. The spirit of the local culture on the flavor of their sense of the times given.
3. Creative design ideas and
Time pursuit of the United States, the waters of the United States, the US countryside, the weeds of the United States, Hua Mei's forest. Create one natural water and soil, a leisure stops, an urban oasis, a public park.
4. Planning
1. The entrances and exits installed
Based on the nature and the surrounding park road conditions, parks set up three entrances and exits, the main entrance located in the east of digoxin River Road, the entrance plaza area of about 1,350 square meters, pay attention to the door of the landscape and visual effects axis; At the entrance to the main channel in the north side of the pathway of commercial walking street, and after living with the planning remote areas Echoing; another entrance at the north end of the planning for the villa area of the independent import and export.
2. Terrain transformation
Transformation of flat terrain, the whole heap Mountain Lake, formed by people as though, since the days Kai Wan, Central Mountain natural landscapes hold water pattern.
Park Hill in the west and north in the park, set up Fu Shan northeast corner, stretching undulating form micro landscape.
Utilization of the water park in southern waters, by the original road and revetment adjusted so that the water system along the southwest - the direction of the Northeast integration.
3. Movement Area
Analysis of the surrounding environment and the park entrance distribution, can be divided into "moving northwest southeast static" pattern. South along the lake with water as the media to carry out development activities, a number of play space; While northern resorts, and other architectural planning, a relatively quiet rest leisure space.
4. District landscape functional fabrics
Part of the two-axis and five functional landscape zoning
4.1 link - various scenic spots throughout the landscape main loop
According terrain topography and tourism activities organizations need to retain the status quo of water dams, the use of retained native landscape of the area will be a main loop by linking, like a珠链ring around the arch.
A Wanyan tortuous landscape loop, in the clean water shuttle from Fangcaodi, constitute the park's gold necklace. It is a link to the base east of the west side of the water and forest association; It is also the气脉of green space, green landscape nodes and the number of landscape space, squares and buildings, linked as a whole.
4.2 two-axle - ecological landscape and scenic spots blend
The two axes formation of a cross-shaped skeleton of the entire park, two axes intersection in the viewing tower Square.
The first axis of the landscape from the main entrance plaza began floating in the sea, through the hydrophilic Square, passing on either side of the fruit forestry, Reed Island arrived at the main park center, on both sides of the axis diverse environment given the state of wetland biodiversity and landscape diversity. A variety of biological communities, for various涉禽,游禽, butterflies and small mammals provides a rich source of food and a good environment to avoid enemy. All the way to visit, singing and laughing, leisurely freely.
Another visual axis from the main channel at the entrance to enter through either side of the lotus pool, direct access to the main plaza Reed finishes, as a pro-Shuimu landscape in one direction while attacking the main, wooden flower racks in one direction while attacking combination,亭廊, Zuodeng such as design, so that visitors can fully stop, a local cruise ship terminals and provide fishing tools, visitors can in a variety of ways hydrophilic.
4.3 five functional landscape zoning
Guided by the principle of the design, combining features of the status quo, will be divided into five functional park varied, full of personality and style similar to the characteristics of functional areas: home, water Court, ecological park, Lin orchards, Business Court, the District each share vacation resort, water sports and entertainment, the ecological Ye Yu, official flower for fruit , the hotel business functions.
(1) home (vacation villa area)
-- The rural countryside Yat, vegetables - ju East Gracilaria, Carefreeness see Nanshan
Homes located in the northwest planning, the main function for the tourism resort and residence. Planning
Low-density, low-rise villas construction mainly emphasized that the living environment of乡野customs. At the same time, both forest belt north and west of shadowing, satisfying the people's privacy needs. Villa area of the belt on the center can separate King, Lakeside landscape sequence is an integral part of the Habitat this can be convenient sharing lake customs.
Villas in the construction of a flexible layout, layout and natural facilities of reasonable application of native trees, creating a customs Tao Yuanming yearn for the rural life paintings of pastoral atmosphere, and let people get away from the tense devotion to relax.
(2) Water Court (water sports and entertainment district)
-- Leisure ecstasy of Fun, fish birds also play music, a scene hygiene conditions Hushan
Water Court is located at the center of regional planning, with plans for the status quo to fish ponds and shrimp pond
And the existing road through the existing landscape elements including water, reed slope, roads and other reservations, reuse and renewable design, as well as traditional elements of the humanities reproduction and highlighted their quiet, the quiet character, forming a fully functioning customs Tour Jiangbei Water Park.
The entire游览区from the south main entrance plaza, at the southwest side of the park, away from the park surrounding the city roads, and on both sides of the water system, green space integrated. Including wooden leisure tour in one direction while attacking zone, Scenic Long Beach, fishing region, the official flower viewing tower beads, flowers official Fusion of Ancient Subject散步道,茶社, leisure boats, as well as throughout the hydrophilic Square and hydrophilic themes such as landscape nodes in one direction while attacking the establishment. Meet the people sightseeing, calmly fishing visit to Cuba寻幽, a chessboard, tea, a variety of activities such as water sports entertainment needs, but also greatly strengthened the park's geographical characteristics.
(3) Ecological Garden (plant ecological tourist zone)
-- Ecological野趣beauty雁声Ashiba old, Lu Ying Liu Hua Han
Ecological Park posed by the two most district, the Botanical Garden District and wetlands tourist spots.
Botanic Garden Plant Landscape District to the main. Most of the original farmland west, planning for the plant
Park, through this plan to become a quiet Tian Mi of forest leisure resort. Create a more Chanzao Lin Jing, Tonamiyama more unseen woodland landscape atmosphere. In this setting of fitness activities for young people expand areas. Design of a large number of projects can be participatory fitness, but also into some popular science educational facilities, fun to young people's physical and mental health was improving in this.
The southern gate of the park is planning westbound 100 meters reservoirs of wetlands. The planning of the original wetlands on the basis of the original reed lakeshore to preserve and increase cattail, Iris, and other types of wetland plants, local integration in the original Lakeshore modified, it highlights the reed野趣beauty. The water body within the region. Lotus in reservations on the basis of increasing aquatic plants water lilies,远观its potential, its posture in recent tours, formed莲荷Zhengyan landscape, but will extend the period of ornamental landscape. The laying of the original landscape along the street in one direction while attacking provide people close to the wetlands, enjoy natural野趣space.
(4), the orchards (Flower Forest officials fruit characteristics)
-- Enjoy fruitful honest, Kaixuan face场圃, if Sangma Award Released wine
Lin orchard located in the eastern part of the planning, direction and digoxin and endangered. Planning retain the original jujube Lin,
At the same time increase the chestnut, walnut, fig, mulberry tree, Ginkgo biloba, Lin varieties Apple, pear orchard, persimmon Lin, Jun transfer sons, Xinglin, and other economic, fruit trees, increase loose, Shan and other常绿树species formed three quarters of a flower, spent four seasons with the fruit characteristics fruits tourism official Lin. The original combination of lotus ponds and reservoirs, and developed a highly geographical characteristics of fresh fruit Chau, forest fruit set Museum, and let people viewing at the same time can personally get involved plucking a taste of the characteristics of both color fruit flavor.
(5) Business Court (Business Hotel Zone)
-- Four Seas congregated in the Cheong, interpersonal Mong access, demand horsemen Thrill
Planning to Court is located at the site of the south-east, East and digoxin and adjacent road, connecting the South with the main channel.
Planning and construction of a two-tier comprehensive hotel. Hotel architectural style fashion new, very modern flavor. Design complete functions, sets hotel, conference, fitness, leisure and shopping integration.
Regional spatial structure of the distributed along the street into the square, integrated hotel and leisure territorial waters shopping streets in three parts. Which hotel is a business park of a landmark building one.
Chapter IV planting Planning Analysis
Park Plant planning to reflect the ecological, geographical principle, the combination of different functions by the district to create the atmosphere, the selection of tree species were also focused.
The hotel business is more concentrated area for the regional flow, choose tree species as beautiful varieties, such as cedar, Kwong Yu-lan, Ginkgo biloba, Melia azedarach,五角枫Huangshan Luan, and other species dominated landscape.
Fruit Forests to Robinia pseudoacacia, Sophora japonica,法桐and other native tree species as the background, consisting mainly of a variety of fruit trees dongzao King mainly to oil trees, such as cypress Shu off King to jointly create a made great achievements Keren scene.
Eco-tourism zone plants set up in two parts plants, the area around the botanical gardens and take Huai, wax, etc. for the surrounding background, and chose the northern region can grow well but they have not been large-scale application of the species disposes King, cedar,大叶女贞such常绿树species with King, forming a set of popular science, Tour , leisure and the Four Seasons one plant garden. Reservations reed wetlands area reservoirs, Lotus, Iris at the same time increase, water lilies, weeping willow, Changpu Joe shrubs such as water resistance, the formation of a "Jian Jia苍苍, egret for the Sandinista" wetland ecological effects.
Water sports and entertainment district to vibrant plant configuration, but also with the traditional tree applications. To keep the original design of the reed, increase weeping willow, Ziwei, Tau Hwang, such as the water used Qiao Ying-chun, shrubs and Hongfeng, such as color Chickenpaw maple leaf trees. Reflect movement, and vitality.
The holiday bungalow in a variety of viewing tree species mainly at the same time follow a variety of shrubs, planted grass less the principle of upgrading the quality villas, while reducing the final stages of the costs.

The Diaoyu Islands effect map
Chapter V vertical planning
1. Venues
The vertical design of the terrain while maintaining the existing mainly to circumvent the excavation and filling. In the center of the use of the existing fish ponds, a major expansion of its surface water features; dug up by the Turkish side of the ecological tourism zone in a heap terrain so that the Turkish side to balance the spot, while breaking the original flat topography, the landscape level richer, more diverse portfolio space.
Park venue vertical design based on the surrounding road elevation and elevation of the status quo venues, and basic control in the 5.6 to 7.5 m between the relatively gentle slope in most regions, activities for people. Parks highest elevation point of 7.5 meters, mountain height 2 to 4 meters.
2. Water
Water Park in the area of a total of 20.25 ha, use gravel, stone slope protection and natural hair grassland revetment, and other forms combined.
Park main surface revetment height control elevation 5.6 m, and often the water level elevation 4.6 meters, the lake elevation 4.1-2.6 meters; Wetlands water depth of 1-1.5; Fishing water depth of 0.8-1.0 meters; Children the Water District water depth of less than 0.4 meters.
Chapter VI transport system planning
People will have two lines, First purely conventional cul-de-sac, and the other is the landscape tour trail, the landscape sequences in various attractions on the main concept.
1 Yuen Road walking tour system
Planning main Yuen Road, the service road and cul-de-sac three settings, using circular layout patterns.
Main Yuen Road for the tour by serving as the park management lane,路宽eight meters, the park along the outer gate linking the three parks for the entire park through the big loop.
The slip road from the main road walking tour,路宽four meters, the distribution of natural connecting major scenic areas and spots.
Lane Road walking tour for the secondary,路宽1.5 to 3 meters in the internal landscape of the park cul-de-sac.
2 battery car tour system
Designed to be installed in the storage battery car park tour system, a total of three sites located, the terminus located in the south east entrance, provide convenience for tourists visit the additional tour fun.
3 Water Tour System
Park surface as a major part of the landscape, through scenic areas between the boat Garden赏景, do not have taste. Set up in the park at the eastern yacht pier, combining水榭processed.
Chapter VII Square, road, bridge design and planning garden
1. Plaza
Plaza role is three-fold: Traffic Organization, the crowd DCS, landscape role. The design of the full role of co-ordinating the three were set up in the entrance plaza of three, five traffic landscape Square. According to the square in which each different region, different design styles to meet the needs of different functions.
2. Road
Road design to reflect the natural, ecological, cultural,野趣concept as the goal, the main trunk road to asphalt road, the main road to primary colors mainly prefabricated concrete blocks, sidewalks Road to the processing of natural stone or artificial stone铺贴Road mainly at the same time, major tour has many water lines in a variety of wood pavement Stack Road-based.
3. Park Bridge
Park Bridge Park Landscape is the important components of the design to take a variety of modeling. The main lane concrete arch bridge, and surface stone曲桥, wood曲桥, Stone Arch Bridge, and the combination of all kinds in one direction while attacking bridges, log bridges and so on to meet the functional needs, and enriched the Landscape element fully embodies Water customs.
Chapter VIII facilities planning
1. Park capacity
Parks and playgrounds capacity is the capacity of various facilities, the number, size and the basis for park management.
In accordance with the nature of this park, the park surface area of 32.0%, according to park visitors with a per-capita area of 100-150 m2, Park capacity of about 4000-6000 people.
2. Facilities types
(1) multi-service facilities
Hotel Business District comprehensive business hotel with complete functions, sets fitness, catering, entertainment, meetings, shopping into one. Architectural modeling chic elegant hotel is a landmark of the park one building.
(2) utilities
Including toilet 6, car parks, bicycle parking, telephones, garden lights, direction signs, garbage bin, drinking fountains, etc.;
(3) recreation facilities
Main contents, including viewing towers, pavilions, corridors, scaffolding and other landscape architecture, as well as terminals, fishing facilities, venues, and other activities. Total viewing tower high 89 meters, the main 66 meters, take a sightseeing tower elevator may direct access to the top platform, in this, the government spent the entire Mayfair Mall. The park is another landmark buildings.
(4) cultural popular science facilities
Major exhibitions include greenhouse, fruit Archive.
Chapter IX planning pipeline project
1. Water Supply
Mainly through two ways:
The first main canal system to the urban landscape, set up sluice Park lake water level control, and the urban landscape of the main channel stream Unicom, a flowing water park; The second holiday bungalow in the park and business hotels for an independent water supply networks for the construction of internal domestic use.
2. Drainage
The planning system using stormwater drainage system for sewage diversion, the park green space drainage mainly to natural drainage. Well administered by domestic sewage discharged into city sewers.
3. Power
(1) Park electricity mainly consists of two parts: the construction of electricity and landscape electricity;
(2) As Park as a large integrated parks, as many, larger electricity capacity, the introduction of high-handedness. Power primer from the high pressure east of the park, located in the eastern area transforming a room; Distribution Room distribution system from the use of radiation to electricity-distribution points. All power supply circuits are buried laying a total length of about 10 km.
(3) security of electricity
Design and construction in the use of advanced, secure appliances and electrical systems, management and use of the relevant departments to comply with national security requirements. Because some of the park area and lots of humidity in the environment, should pay particular attention to the design and operation of electric measures and leakproof leakage and leakage alarm, power protection measures to protect visitors and staff safety.
4. Communications, such as heat pipes
Parks and communication facilities should be spent officer linked to the rural communication system, and should be linked with the modernization of domestic and international communications equipment.
In addition, the Park Conservatory and thermal management space required matching pipelines to meet the requirements of plant growth.
Chapter 10 economic and technological indicators
Land classification area (ha) is the proportion (%)
Green area 31.44 49.8%
Road, the venue 7.1 11.23%
Water 20.25 32.1%
Public construction 1.58 2.5%
Holiday Villa 2.5 3.17%
Parking 0.2 (120) 0.3%
Greenbelt rate (including water) 81.89%
The site 63.12 100
Construction investment estimated Chapter 11
Project Title Cost
Earthwork 1.05 million yuan
Green Project 15.87 million yuan
Road Plaza project 5.68 million yuan
Water refurbishment 4.05 million yuan
Public buildings 28.7 million yuan
Holiday Villa 30 million yuan
Electricity cost 1.2 million yuan
To drainage 1 million yuan
The total project cost of 85.67 million yuan